Sunday 28 February 2016

Finishing Trades - handover date locked in!

After the slow start to the year things have now got moving with the finishing trades moving in while the tilers were still wrapping up. The sparkies have now installed all the lights and power points, plumbers done all the sinks and drains, and the french polishing of the staircase almost complete.

It was great to see everything taking shape on our site visit during the week. The feature tiles in the ensuite and powder room, the stack stone pier at the front of the house, the buried LPG gas cylinder (EasyGas DownUnder), door hardware, sinks, baths, shower hardware, and toilets are in! The garage doors and termite reticulation system installed, and the running water and power makes finishing soon a reality!

On that point we have a handover date - Friday March the 11th... We can't wait!

This week we are expecting the wooden floors to be sanded before being coated, and the following week the cleaners before the carpet gets laid...

We are looking forward to seeing how good it looks after the cleaners have been in - they have a monumental cleaning job ahead of them! Hopefully the clean is through and because the painting was done earlier than planned there is dust all over the walls and ceiling, and no doubt this will get worse with the floor sanding.

We are busy getting all the post house finishing trades locked in - the driveway, landscaping, pool fencing, plantation shutters as well as getting the moving and new furniture logistics under way! It is staggering how much needs to be done!

Here are all the latest pictures from our site visit and more recent ones!...



Kitchen

Powder Room

Bathroom

WC

Ensuite

WIR

Clipsal Saturn Switches

Garage Doors

Elgas EasyGas DownUnder - a 90kg gas cylinder hides underground!