In the last three weeks the following has been done:-
- Roof Frame Erected (2nd Prog. Payment - 17/7)
- Site inspection with SS (21/7)
- Windows delivered (22/7)
- Windows and door frames installed (27/7)
- Internal water pipes and drainage completed (27/7)
- Bricks delivered (30/7)
The site inspection with the SS was exciting - the first time we would see and walk through the ground floor and get a feel for our house layout.
The only issue we noticed onsite was a downpipe drain right outside the laundry door that will require moving. I believe some sort of inspection has taken place since and the carpenters had a short list of minor frame modifications to do.
Currently we are in a two week holding pattern for the brickies to start which we have been told will be around this time next week. Hopefully the weather holds out as we have been experiencing nice dry weather.
Here is the picture diary...
The window frames are in dune |
Internal water pipes being installed
Lounge showing entry point for water (blk pex pipe) and gas (yel pex pipe) |
A network of water pipes incl. the red hot water pipes |
Solar Hot Water system location showing pipes to/from future solar panels |
Powder room shower & WC showing green rainwater pipe |
Kitchen showing link for service to the island bench |
Butler's Pantry |
Our prized indoor/outdoor double sided fireplace between Rumpus & Alfresco |
We counted 31 pallets of our feature brick, each containing 380 bricks = 11,780 bricks! In addition we have 8 pallets of generic brick for the rendered front pillars. |