Monday 26 October 2015

Electrical, Air Conditioning, and Alarm rough-ins.

It has been a little while since the last post, so here is an update.
Things are still moving quite nicely now with steady progress on many fronts.

We now have seen the solar panels installed on the roof for the hot water, the scaffolding removed, bricks cleaned, lower roof completed (fascia, gutters, tiles, and rear colour bond), and just completed is the electrical/air conditioning/alarm rough-ins.

We are still very happy with the quality of the work we are seeing, however we are not experts so have decided on two inspection points for piece of mind.
We have engaged Bill from Jims Building Inspections to do a detailed inspection for us before the plaster goes on the walls and roof, and will arrange a second inspection at the end. We got a few quotes and saw examples of the reports produced. Tyrrells was one we looked at that had a similar detail in the report yet adjusted their fees to a exorbitant level based on the total project cost... (double Jims cost).
Hopefully no major issues are found, we will let you know how it goes!

Here are the latest pictures:-