Over the past week the following has been done:-
- The ground has been prepared and edge formwork constructed.
- The under-slab drainage installed
- Laying the plastic sheeting concrete underlay
- Fix reinforcement in the beams using steel mesh at the bottom
- Fix reinforcement in the slabs using steel mesh at the top
- Termite Barrier Installed?
- Pour and compact the concrete
- Finish slab surface
- Cure the slab